We do not pretend to make complex work simple. We make it manageable. Finance is complex, and ACUMENTIQUE, our implementation method, makes it manageable for the people who carry the responsibility and do the work.

Classic ERP delivery is a waterfall: analyse, design, build, test, train, go live. It has one virtue (everyone knows where they are) and one flaw: nobody sees the whole system until the end, and by then it is too late to disagree. Agile fixes the second problem and creates a third: an ERP is a single set of books, and a ledger does not accept a minimum viable month-end.

ACUMENTIQUE keeps the waterfall's spine: six stages, each closed by a quality gate. Inside the stages, the work runs in streams that move at their own pace, with room to loop back where a finding calls for it.

Six stages, each closed by a quality gate

A stage ends when its deliverables are complete, tested where they can be tested, and signed. A workshop or a walkthrough is a means; what counts is the signed result it produces.

  1. Initiate
  2. Analyse
  3. Build
  4. Test
  5. Deploy
  6. Support
A quality gate closes every stage: the next one starts on signed deliverables.
  1. Initiate

    Governance comes before configuration: who decides what, when the project meets, who is away when, the project plan, the system landscape and the release schedule.

  2. Analyse

    We review the current processes, systems and ways of working with the people who do the work, at their desks and on the shop floor. The Target Operating Model and the gap list come out of it, with the architecture decisions inherited from the ACURATE evaluation.

  3. Build

    Configuration, development, electronic reporting, forms and dashboards, and integrations, each tested by us as it is built. On paper they are separate types of work; in reality they are intertwined inside a process scope such as invoicing within order-to-cash, and we manage them that way, by scope, not by work type.

  4. Test

    Our lead consultants test end to end, the streams are tested together, and the people who will run the system test it themselves. Key users walk through each work package as it takes shape, so the final acceptance confirms rather than discovers: a late, big-bang acceptance test is the most reliable way to send a project back to the drawing board.

  5. Deploy

    The data migration is rehearsed, reconciled and signed off with the accountant who will close the first month. Training runs by role, in the users' language, on their own data. Then the cutover, a smoke test in production (the "penny test") and go-live.

  6. Support

    Hypercare through the first closing cycles, with us present. The internal administrator has been on the project since the first stage, and the documentation and the support portal have been growing since the analysis. Go-live is the day they take over, not the day they start.

Streams from A to Z

Inside the stages, the work runs in streams, each named by a letter. The alphabet follows the project, from A at the start to Z at the end:

  1. Administer and initiate

    Governance structures, meeting schedules, absence plans and the project plan.

  2. Business analysis

    Current processes, systems and ways of working, reviewed with the people who do the work.

  3. Configuration and customisation

    The system set up for the processes agreed in the analysis.

  4. Development

    What configuration cannot cover, specified, built and tested.

  5. Electronic reporting

    E-invoices, payment files and statutory reports.

  6. Forms and dashboards

    What customers, suppliers and managers see from the system.

  7. System governance

    The system landscape and the release cycles, managed from the first stage.

  8. Integration

    The interfaces to the systems around the ERP.

  9. Key-user walkthroughs

    Each work package walked through end to end by the people who know the process.

  10. Lead-consultant testing

    End-to-end tests by our lead consultants before the users test.

  11. Migration

    Data profiled, mapped, rehearsed and reconciled.

  12. System integration testing

    The streams tested together.

  13. Training

    By role, in the users' language, on their own data.

  14. User acceptance testing

    The people who will run the system confirm that it works for them.

  15. Cutover and smoke testing

    The switch to the new system, checked in production.

  16. Go-live

    The day the business starts running on the new system.

  17. Hypercare

    The first closing cycles, with us present.

Every deliverable has a number

Each stream's documents carry its letter and three digits, so a document's number says where it belongs and what it builds on. The same numbers structure the project folder during the project and the support portal after it. That is what institutional learning looks like in practice. Why we always quote for the people

Every project starts from our project templates, so the method is how the work is organised from the first day, not a slide in the proposal.

Functional streams

The letters say what kind of work it is. The functional streams say which part of the business it serves: typically General Ledger, Order Management (order-to-cash), Procurement (procure-to-pay) and Project Management, plus the streams your industry needs: production, service, assets. Each functional stream moves through the stages on its own rhythm and adjusts to what it learns.

Two overarching streams hold them together. The Project Management Office manages dependencies and the timeline across streams. User Adoption keeps the people who will use the system in the room from the first week, and makes sure user experience never leaves centre stage.

Functional streams run the same stages at their own pace. Two overarching streams hold them together.

Project Management Office

dependencies and the timeline across streams

  1. General Ledger

    1. Initiate
    2. Analyse
    3. Build
    4. Test
    5. Deploy
    6. Support
  2. Order Management

    order-to-cash

    1. Initiate
    2. Analyse
    3. Build
    4. Test
    5. Deploy
    6. Support
  3. Procurement

    procure-to-pay

    1. Initiate
    2. Analyse
    3. Build
    4. Test
    5. Deploy
    6. Support
  4. Project Management

    1. Initiate
    2. Analyse
    3. Build
    4. Test
    5. Deploy
    6. Support
  5. Industry streams

    production, service, assets: as your business needs

    1. Initiate
    2. Analyse
    3. Build
    4. Test
    5. Deploy
    6. Support

User Adoption

the people who will use the system, in the room from the first week

The Target Operating Model comes first

Before any stream configures anything, its lead drafts the Target Operating Model for that scope: policies (why the process exists and what it must guarantee), processes (how it runs end to end), people (who runs each step, where, in which language), and only then technology. Three consequences:

Each stream drafts its own Target Operating Model; Finance is the example. Select any part of the model to read what it settles.

Use the arrow keys to move between the parts of the model.

Vision Mission Strategy Tactics Business Idea Business Plan Business Strategies Marketing Contracting Support R&D Support IT Sales HR Service Finance Policies Processes People Technology

Direction

Vision

Why the business exists and where it wants to be. Everything below it, from the business idea to the last system setting, should trace back to it.

Direction

Mission

What the business does, for whom, day after day, to move towards the vision. It decides which ideas, plans and strategies belong to the business at all.

Direction

Strategy

The choices that turn vision and mission into priorities: the business strategies and, derived from them, one strategy per function. In the operating model, strategy ends where policies begin.

Direction

Tactics

How the strategy is carried out: the processes that run the work, the people who run the processes and the technology that enables both. This is the part of the model an ERP implementation touches most.

Corporate pyramid

Business idea

Connect the vision and mission to the customer need the business exists to meet. Make the intended value explicit before deciding how to organise delivery.

Evidence: an agreed purpose, target customers and the value promised to them.

Corporate pyramid

Business plan

Describe the business model, expected demand, resources and economics. Test whether the ambition can be sustained and which assumptions need evidence.

Evidence: a viable plan, measurable outcomes and accountable owners.

Corporate pyramid

Business strategies

Choose where to compete, how to serve customers and which capabilities the business must develop. Translate corporate choices into coherent priorities for each function.

Evidence: agreed priorities, capability gaps and a coordinated change portfolio.

Functions

Functional strategies

Selected function

Each function derives its own strategy from the business strategies: research and development, marketing, sales, contracting, service, support, HR, IT and finance. Each function then needs an operating model of its own; the model enlarges Finance as the example.

Functions

Finance Target Operating Model

The finance strategy made operational in four layers, agreed in this order: policies, processes, people and technology. In an implementation, every functional stream drafts the same four layers for its own scope before anything is configured.

Technical services (customisation and integration) follow the functional leads. Never the other way round.

Target Operating Model

Policies

What the business has decided, and why: approval limits, credit rules, revenue recognition, what counts as a project.

Processes are understood in terms of their purpose, not merely as "how we have always done it".

Role in operationalisation

Leader & Director of Operationalisation

  • Simple & Clear, not Complex & Vague

Evidence: policy owners, approval limits and agreed treatment of exceptions.

Target Operating Model

Processes

How those decisions are executed, end to end.

Role in operationalisation

Leader & Director of Operationalisation

  • executing streamlined Processes

Evidence: future process maps, control points and representative acceptance scenarios.

Target Operating Model

People

Who executes each step, with which skills, in which location and language.

The right people are identified early and enter the testing and training plans by name, so availability gaps and staff transitions are called before they become risks.

Role in operationalisation

Organisation of Resources for Operationalisation

  • executing streamlined Processes

Evidence: role ownership, access needs, capacity commitments and a training plan.

Target Operating Model

Technology

Which system, which configuration, which integration supports the three layers above.

The 3Ps are the three layers above: policies, processes and people.

Role in operationalisation

Enabler & Accelerator of Operationalisation

  • enabling the predefined 3Ps
  • executing streamlined Processes

Evidence: a traceable solution design, tested configurations and assigned operational ownership.

  1. Processes are understood in terms of their purpose, not merely as "how we have always done it".
  2. The right people are identified early and enter the testing and training plans by name, so availability gaps and staff transitions are called before they become risks.
  3. Technology stays a means to business ends, never the reverse.

Technical services (customisation and integration) follow the functional leads. Never the other way round.

Project governance

Governance is the first stream, not an afterthought. In the first stage, the A stream settles who decides what, how often the project meets and how the plan is kept, and the G stream settles the system landscape and the release cycles. The project management office and the stream leads coordinate across the streams and keep dependencies and the timeline visible to everyone. Every stage closes at its quality gate with signed deliverables, so the decisions that steer the project rest on documents, not on impressions.

Why not "just agile" or "just standard"?

Standard configuration first, always. Iteration inside streams, always. But a ledger, a tax return and a payroll run are not features to release incrementally; they are correct or they are not.

The idea that an agile approach, or no fixed method at all, keeps an ERP project lean and simple is a fallacy. Nobody runs an airport without standard operating procedures, because a complex system needs them, and an ERP runs a company. ACUMENTIQUE gives the business the certainty of a waterfall on the things that must be right, and the flexibility of iteration on everything else.